Framing out a new wall and door at a Greenpoint back office

Framing out a new wallThis project involved, building a new wall using sheetrock and metal studs, plastering the wall, painting, refinishing the floors and installing a set of French doors.

Work in Progress on French Door and New Wall renovation in Soho, NYC

Working on French Door and New Wall

Working on French door and new wall renovation. A first coat of plaster has been applied to the newly installed sheetrock. 2 more coats of plaster are needed, followed by sanding, priming and finally painting. The French door needs to be primed, lightly sanded, and 2 coats of paint is needed. The door is finished off by installing a lock provided by the client as per her design style.